GTIA "LÉGION" / PCIATHQ: BOA NAPOLEON DTG: 170500ZOCT25
OPORD 05: "SANGAR SWEEP" (NETTOYAGE SANGAR)
REFERENCES: A. Map Series: KUNAR_VALLEY_50K_V2 B. AAR OP 04 (Sangar Assault) C. INTEL SUM: ISUM_RED_05
TIME ZONE: ZULU
1. SITUATION
A. General (Situation Générale)
Following the establishment of CP ARCOLE (Grid 030003), GTIA forces maintain a foothold in the Sangar Valley. The "Castle" (028002) has been destroyed. However, the enemy maintains a strong mechanized presence in GULAHY SHAL and JHARNOK. Engineering Status:
OP LASALLE & OP MURAT: Currently under construction by 1er REG. Not yet operational for this phase, but the ground near Lasalle is available for overwatch.
B. Enemy Forces (ENNEMI)
INS-MECH-01 (Target):
Strength: Battalion-sized Mechanized Infantry.
Location: Gulahi Shal & Tank Repair Installation (Grid 033005).
Status:Credibility A1. Estimated 65% Combat Effectiveness due to previous strikes, but continuously reinforcing.
Assets: MTLBs, BMPs, BTRs, fortified positions.
INS-MOT-01 (Reinforcements):
Strength: Company-sized Motorized.
Location:KHARKA DAHY (North of Zaymur River).
Status:Credibility C3. Anticipated to move South via MSR to reinforce Gulahy Shal.
GREEN 2 (Section Vert 2): Reconstituted Reinforcement Platoon (4x VBCI).
NOIR 5-1 (2 REP): Platoon-sized Fire Support element.
Air Assets: GBU available. NO ROTARY WING (High AA Threat).
2. MISSION
GTIA LÉGION elements are to CLEAR the town of GULAHY SHAL, DESTROY the enemy armor installation, and SEIZE the JHARNOK FOB in order to stabilize the Sangar Valley and block insurgent flow from the Northern Province.
3. EXECUTION
A. Commander's Intent
We will methodically dismantle the enemy mechanized capability in the valley. By utilizing high-ground observation (Noir 51) and heavy direct fire (VBCIs), we will isolate Gulahy Shal before clearing it house-to-house. The end-state is the total denial of the valley floor to enemy armor and a secure defensive line at the Zaymur River.
B. Concept of Operations
PHASE 0: DEPLOYMENT & ISOLATION
NOIR 5-1: Infiltrate and establish Fire Support Position (FSP) near the future site of OP LASALLE.
Task: Provide intel on Gulahy Shal and early warning on INS-MOT-01 movements from the North.
GREEN 1-2: Establish Base of Fire (BOF) 200m East of CP ARCOLE.
PHASE 1: CLEARANCE OF GULAHY SHAL
GREEN 1-1: Main Effort. Push into GULAHY SHAL and conduct systematic clearance (Clear-Hold-Build).
GREEN 2: Follow and Support. Reinforce Green 1-1’s flank and provide heavy VBCI fire support against hardened structures.
Objective:DESTROY the Enemy Tank Installation (Grid 033005).
PHASE 2: RESUPPLY & JHARNOK ASSAULT
Trigger: Gulahy Shal Declared Secure.
Action:
Green 2: Occupy Gulahy Shal defensive perimeter (Relief in Place of Green 1-1 for resupply).
Green 1-2: Displace forward to the Embankment (50m East of town) overlooking JHARNOK.
Green 1-1: Assault and SEIZEJHARNOK FOB.
Green 1-0: Establish Command Post & Casualty Collection Point (CCP) near Green 1-2.
PHASE 3: BLOCKING POSITION (ZAYMUR LINE)
Objective: Prevent counter-attack from INS-MOT-01.
Action: Green 1 and Green 2 establish a heavy defensive line facing North at the ZAYMUR RIVER BRIDGE.
Engineers: Continue construction of OP Lasalle behind the screen.
C. Coordinating Instructions
ROE:RESTRICTIVE. Civilians expected in Gulahy Shal.
All civilians are to be detained (Prisoners) and moved to the rear (CP Arcole -> BOA Napoleon).
No unobserved indirect fire into the town center unless troops are in extremis.
Fire Support:
GBUs: Priority to confirmed Armor (T-72/BMP).
Mortars: 81mm/120mm available on call.
Prisoner Handling: Green 1-0 designates PCP. Extraction by Green Command logistics.
4. SERVICE SUPPORT (LOGISTIQUE)
Resupply: Scheduled pause between Phase 1 and Phase 2.
A. Supply
Rations: 24hrs on person.
Ammo: Basic load. Extra 5.56mm and 7.62mm linked available via vehicle resupply.
Water: Critical. 3L per man minimum.
Vehicle Recovery: VBCIs are self-recovering where possible; heavy recovery assets at BOA Napoleon on standby.
B. Medical
CCP (Casualty Collection Point): TBD by medical team.
Role 1: embedded with Green 1-0.
Role 2: BOA Napoleon Medical Station.
MEDEVAC:
Category A (Urgent): Launch Scramble.
Category B (Priority): Ground convoy if road is clear.
C. Prisoners
A collection point will be established near Gulahy Shal village.
5. COMMAND & SIGNAL
Green 1-0 (Cdt Green 1): Located with Support Element (Phase 2).
Green 2-0 (Cdt Green 2): Located with VBCI element.
OPORD 05: "OPERATION EQUILIBRE"
LÉGIO PATRIA NOSTRA
GTIA "LÉGION" / PCIAT HQ: BOA NAPOLEON DTG: 170500ZOCT25
OPORD 05: "SANGAR SWEEP" (NETTOYAGE SANGAR)
REFERENCES: A. Map Series: KUNAR_VALLEY_50K_V2 B. AAR OP 04 (Sangar Assault) C. INTEL SUM: ISUM_RED_05
TIME ZONE: ZULU
1. SITUATION
A. General (Situation Générale)
Following the establishment of CP ARCOLE (Grid 030003), GTIA forces maintain a foothold in the Sangar Valley. The "Castle" (028002) has been destroyed. However, the enemy maintains a strong mechanized presence in GULAHY SHAL and JHARNOK. Engineering Status:
B. Enemy Forces (ENNEMI)
C. Friendly Forces (AMIS)
2. MISSION
GTIA LÉGION elements are to CLEAR the town of GULAHY SHAL, DESTROY the enemy armor installation, and SEIZE the JHARNOK FOB in order to stabilize the Sangar Valley and block insurgent flow from the Northern Province.
3. EXECUTION
A. Commander's Intent
We will methodically dismantle the enemy mechanized capability in the valley. By utilizing high-ground observation (Noir 51) and heavy direct fire (VBCIs), we will isolate Gulahy Shal before clearing it house-to-house. The end-state is the total denial of the valley floor to enemy armor and a secure defensive line at the Zaymur River.
B. Concept of Operations
PHASE 0: DEPLOYMENT & ISOLATION
PHASE 1: CLEARANCE OF GULAHY SHAL
PHASE 2: RESUPPLY & JHARNOK ASSAULT
PHASE 3: BLOCKING POSITION (ZAYMUR LINE)
C. Coordinating Instructions
4. SERVICE SUPPORT (LOGISTIQUE)
A. Supply
B. Medical
C. Prisoners
5. COMMAND & SIGNAL
ACKNOWLEDGE: COL "[REDACTED]" Commanding, GTIA Légion